Southern Pacific / Richards
Official planning, permit, business, food, liquor-license, Public Works capital-project, and project-linked City Hall records for this Sacramento neighborhood.
- Norcal Strength Systems, LLC City business registration becomes inactive at 1106 D St 7City registration inactive or expired; storefront closure not confirmed
City business records list Norcal Strength Systems, LLC at 1106 D St 7 with status “Expired”. The registration is an early place signal; it does not confirm an opening or opening date. An inactive or expired registration does not by itself confirm that a storefront closed.
- SVS LRT Station Relocation is in final designUnder Review
Sacramento Public Works lists SVS LRT Station Relocation in the “Final Design” phase. PM- Greg Taylor close out project. Schedule fields are plans and may change.
- SVS Light Rail Relocation Project is in final designUnder Review
Sacramento Public Works lists SVS Light Rail Relocation Project in the “Final Design” phase. The official capital-project map does not provide a longer description. Schedule fields are plans and may change.
- Richards Blvd/I-5 Interchange is in City planning or preliminary engineeringProposed
Sacramento Public Works lists Richards Blvd/I-5 Interchange in the “Preliminary Engineering” phase. The Richards Boulevard I-5 Interchange project will make improvements to the existing interchange to improve traffic operations in the River District and Railyards. Schedule fields are plans and may change.
- SVS-Railyards North Entrance is listed as in constructionConstruction
Sacramento Public Works lists SVS-Railyards North Entrance in the “In Construction” phase. Railyards Owner to construct new accessible entrance/exit from north end of Steve Cohn Passageway (SVS pedestrian tunnel) to a new ground level plaza in the Railyards Central Shops. The project will include stairs and accessible rampway in a landscaped area with permanent 24/7 pedestrian/bike easement through the plaza to the public streets. Schedule fields are plans and may change.
- Truxel Road Bridge Over American River is in City planning or preliminary engineeringProposed
Sacramento Public Works lists Truxel Road Bridge Over American River in the “Planning” phase. Multi-modal Truxel Bridge Feasibility Study Schedule fields are plans and may change.
- Audible Signals Phase 2 is in final designUnder Review
Sacramento Public Works lists Audible Signals Phase 2 in the “Final Design” phase. Install APS at 12 intersections throughout the City and to reconstruct noncompliant curb ramps at 6 intersections. Schedule fields are plans and may change.
- I Street Ramp Reconfiguration (3rd Street Access SVS) is in City planning or preliminary engineeringProposed
Sacramento Public Works lists I Street Ramp Reconfiguration (3rd Street Access SVS) in the “Preliminary Engineering” phase. The I Street Ramp Reconfiguration Project will re-aligning the NB I Street on-ramp to I-5 to improve operations at the Sacramento Valley Station. The project has an approved planning document from Caltrans and is seeking funding for environmental clearance, design, and construction at a future date. Schedule fields are plans and may change.
- SVS Storm Drain Line & Design Update is in final designUnder Review
Sacramento Public Works lists SVS Storm Drain Line & Design Update in the “Final Design” phase. South of the Tracks (SOTA) Railyards Storm Drain Line segment through SVS. Schedule fields are plans and may change.
- SVS Regional Bus Hub-NEPA is in City planning or preliminary engineeringProposed
Sacramento Public Works lists SVS Regional Bus Hub-NEPA in the “Preliminary Engineering” phase. The project includes: an elevated 18-bay bus station above a lower-level mobility center. The upper concourse houses bus operator breakroom and restrooms, passenger waiting areas, and with 10 bays provided with electric charging infrastructure to the point of connection. Below the bus level, a lower-level mobility center will consist of a dedicated area for micro-transit and shuttle pick-up and drop-off with provision for 116 vehicle spaces with capability provided for EV car charging and car share and the potential for autonomous vehicle facilities as a central hub. At the passenger tunnel level, the existing passenger tunnel serving the rail facilities will be expanded for a bike station and storage infrastructure and public restrooms. An extension of the existing F Street Bikeway to a Class I facility terminating at 2nd Street and provides direct access to the station mobility level. Schedule fields are plans and may change.
- Application filed for DEFERRED - Alchemist Public Market - Freezer Storage Unit at 341 N 10TH STApplication Filed
A City permit application filed on 2026-07-24 calls for DEFERRED TO COM-2511980. Deferred submittal for walk-in coolers freezer storage unit. This records a proposal, not an approval or a construction start.
- Application filed for DEFERRED - Alchemist Public Market - Fire Alarm at 341 N 10TH STApplication Filed
A City permit application filed on 2026-07-24 calls for DEFERRED TO COM-2511980. Deferred submittal for New Fire Alarm. This records a proposal, not an approval or a construction start.
- Test permit cancelled at 300 RICHARDS BLVDCancelled
City records list the permit as cancelled on 2026-07-10. Its recorded scope was test; it should not be presented as active work.
- Application filed for SRFC Stadium -PHASED PERMIT FOR DRY UTILITIES at 11 7TH STApplication Filed
A City permit application filed on 2026-07-09 calls for PHASED PERMIT TO COM-2518055 for dry utilities. This records a proposal, not an approval or a construction start.
- Planning application filed for Dos Rios Condominiums Extension at 601 Dos Rios StApplication Filed
Sacramento planning records show a In Progress application dated 2026-07-08 for Dos Rios Condominiums Extension at 601 Dos Rios St. The filing describes a proposal under consideration; it does not establish approval, construction, or completion.
- Application filed for The railyard aj skylounge at 251 6TH STApplication Filed
A City permit application filed on 2026-07-07 calls for MULTI-FAMILY HOUSING - EPC - Construct two apollo opening roof patio covers (316 and 241 square feet) with electrical on 5th floor terrace. This records a proposal, not an approval or a construction start.
- Application filed for Hvac change out at 819 N 10TH STApplication Filed
A City permit application filed on 2026-07-06 calls for Like for Like HVAC replacement. Remove existing HVAC 5-ton rooftop unit, RHEEM RJNL-A060JK and replace with 5-ton packaged rooftop electric heat pump unit, RHEEM…. This records a proposal, not an approval or a construction start.