SVS Regional Bus Hub-NEPA is in City planning or preliminary engineering

Sacramento Public Works lists SVS Regional Bus Hub-NEPA in the “Preliminary Engineering” phase. The project includes: an elevated 18-bay bus station above a lower-level mobility center. The upper concourse houses bus operator breakroom and restrooms, passenger waiting areas, and with 10 bays provided with electric charging infrastructure to the point of connection. Below the bus level, a lower-level mobility center will consist of a dedicated area for micro-transit and shuttle pick-up and drop-off with provision for 116 vehicle spaces with capability provided for EV car charging and car share and the potential for autonomous vehicle facilities as a central hub. At the passenger tunnel level, the existing passenger tunnel serving the rail facilities will be expanded for a bike station and storage infrastructure and public restrooms. An extension of the existing F Street Bikeway to a Class I facility terminating at 2nd Street and provides direct access to the station mobility level. Schedule fields are plans and may change.

Where
City of Sacramento · Southern Pacific / Richards
Status
Proposed
Date shown
Watch capture date: Aug 27, 2026
Why it matters
This is an early official signal of a proposed physical change at a specific Sacramento location.

Open the primary official record

Then · now · next

Then
We first captured this official record on Aug 27, 2026.
Now
The latest source record we hold shows Proposed; the source did not provide a record date.
Next
The City map lists planned start Jan 1, 2029 and planned end Dec 31, 2029. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.

“Then” is when this watch first captured the record. “Now” uses the source date when one is available.

Recorded timeline

No additional milestones have been captured yet.