Sacramento project record
I Street Ramp Reconfiguration (3rd Street Access SVS) is in City planning or preliminary engineering
Sacramento Public Works lists I Street Ramp Reconfiguration (3rd Street Access SVS) in the “Preliminary Engineering” phase. The I Street Ramp Reconfiguration Project will re-aligning the NB I Street on-ramp to I-5 to improve operations at the Sacramento Valley Station. The project has an approved planning document from Caltrans and is seeking funding for environmental clearance, design, and construction at a future date. Schedule fields are plans and may change.
- Where
- City of Sacramento · Southern Pacific / Richards
- Status
- Proposed
- Date shown
- Watch capture date: Aug 27, 2026
- Why it matters
- This is an early official signal of a proposed physical change at a specific Sacramento location.
Open the primary official record
Then · now · next
- Then
- We first captured this official record on Aug 27, 2026.
- Now
- The latest source record we hold shows Proposed; the source did not provide a record date.
- Next
- The City map lists planned start Jan 1, 2030 and planned end Dec 31, 2030. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.