Ninos Parkway Phase 2 is listed as in construction

Sacramento Public Works lists Ninos Parkway Phase 2 in the “In Construction” phase. Ninos Parkway Phase 2: Extension of the Ninos Parkway trailfrom it's current terminous at San Juan Road northward to the ParkeBridge Development, through the power transmission easement corridor. At San Juan Road, a crosswalk with a pedestrian acuated traffic signal will be installed. At the RD1000 San Juan Ditch crossing, a Caltrans box culvert will be constructed. The trail will tie into existing trails at Citrusparke Ave./Parkchannel Way at the north end. Schedule fields are plans and may change.

Where
City of Sacramento · South Natomas
Status
Construction
Date shown
Watch capture date: Aug 27, 2026
Why it matters
This is an early official signal of a proposed physical change at a specific Sacramento location.

Open the primary official record

Then · now · next

Then
We first captured this official record on Aug 27, 2026.
Now
The latest source record we hold shows Construction; the source did not provide a record date.
Next
The City map lists planned start Jan 1, 2025 and planned end Dec 31, 2025. Watch the official project record for construction updates or schedule changes.

“Then” is when this watch first captured the record. “Now” uses the source date when one is available.

Recorded timeline

No additional milestones have been captured yet.