Ninos Parkway Phase 2 is listed as in construction
Sacramento Public Works lists Ninos Parkway Phase 2 in the “In Construction” phase. Ninos Parkway Phase 2: Extension of the Ninos Parkway trailfrom it's current terminous at San Juan Road northward to the ParkeBridge Development, through the power transmission easement corridor. At San Juan Road, a crosswalk with a pedestrian acuated traffic signal will be installed. At the RD1000 San Juan Ditch crossing, a Caltrans box culvert will be constructed. The trail will tie into existing trails at Citrusparke Ave./Parkchannel Way at the north end. Schedule fields are plans and may change.
- Where
- City of Sacramento · South Natomas
- Status
- Construction
- Date shown
- Watch capture date: Aug 27, 2026
- Why it matters
- This is an early official signal of a proposed physical change at a specific Sacramento location.
Open the primary official record
Then · now · next
- Then
- We first captured this official record on Aug 27, 2026.
- Now
- The latest source record we hold shows Construction; the source did not provide a record date.
- Next
- The City map lists planned start Jan 1, 2025 and planned end Dec 31, 2025. Watch the official project record for construction updates or schedule changes.
Recorded timeline
No additional milestones have been captured yet.