T Street Bikeway Gap Closure (Rehabilitation) is in City planning or preliminary engineering
Sacramento Public Works lists T Street Bikeway Gap Closure (Rehabilitation) in the “Preliminary Engineering” phase. The project is located on T Street between 34th Street and Stockton Blvd. and proposes to reconfigure the vehicle lanes to accommodate continuous Class II bike lanes and calm traffic. The project will also include pedestrian enhancements, such as curb extensions, rectangular rapid flashing beacons, streetlighting, and signal modifications as well as pavement resurfacing, such as microsurfacing. Schedule fields are plans and may change.
- Where
- City of Sacramento · Med Center
- Status
- Proposed
- Date shown
- Watch capture date: Aug 27, 2026
- Why it matters
- This is an early official signal of a proposed physical change at a specific Sacramento location.
Open the primary official record
Then · now · next
- Then
- We first captured this official record on Aug 27, 2026.
- Now
- The latest source record we hold shows Proposed; the source did not provide a record date.
- Next
- The City map lists planned start Jan 1, 2027 and planned end Dec 31, 2027. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.
Recorded timeline
No additional milestones have been captured yet.