Fruitridge Road Improvements - Phase I (65th-Power Inn) is in City planning or preliminary engineering
Sacramento Public Works lists Fruitridge Road Improvements - Phase I (65th-Power Inn) in the “Preliminary Engineering” phase. This project is located on Fruitridge Rd, between 65th Street Expressway and Power Inn Rd. The purpose of the project is to rehabilitate the pavement to good condition, to calm traffic, and improve safety for bicyclists, pedestrians, drivers and transit users. The project will reduce lanes from 4 to 2, and add new separated bikeways, upgraded curb ramps and new bulb-outs, signal modernization, and pedestrian crossing enhancements. The project is currently in the preliminary engineering and environmental clearance phase. Schedule fields are plans and may change.
- Where
- City of Sacramento · Colonial Village
- Status
- Proposed
- Date shown
- Watch capture date: Aug 27, 2026
- Why it matters
- This is an early official signal of a proposed physical change at a specific Sacramento location.
Open the primary official record
Then · now · next
- Then
- We first captured this official record on Aug 27, 2026.
- Now
- The latest source record we hold shows Proposed; the source did not provide a record date.
- Next
- The City map lists planned start Jan 1, 2028 and planned end Dec 31, 2028. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.