Pedestrian Crossing Enhancements 2025 is in final design
Sacramento Public Works lists Pedestrian Crossing Enhancements 2025 in the “Final Design” phase. Planning, design, and construction of Rectangular Rapid Flashing Beacon (RRFB) crosswalks at (4) intersections, (6) RRFB crossing total. Existing curb ramps at 2 corners of one of the intersections will be improved to meet accessibility requirements. Schedule fields are plans and may change.
- Where
- City of Sacramento · American River Parkway
- Status
- Under Review
- Date shown
- Watch capture date: Aug 27, 2026
- Why it matters
- This is an early official signal of a proposed physical change at a specific Sacramento location.
Open the primary official record
Then · now · next
- Then
- We first captured this official record on Aug 27, 2026.
- Now
- The latest source record we hold shows Under Review; the source did not provide a record date.
- Next
- The City map lists planned start Jan 1, 2026 and planned end Dec 31, 2026. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.
Recorded timeline
No additional milestones have been captured yet.