← Sacramento Development Watch

Sacramento project record

Marysville Vision Zero is in City planning or preliminary engineering

Sacramento Public Works lists Marysville Vision Zero in the “Preliminary Engineering” phase. Along Marysville Boulevard from Arcade Boulevard to the North Avenue, reduce the number travelled lanes from four to two, resurface and rehabilitate pavement, construct new traffic signals, modify existing traffic signals, construct pedestrian signal, ADA upgrades, and safety improvements. Schedule fields are plans and may change.

Where
City of Sacramento · Del Paso Heights
Status
Proposed
Date shown
Watch capture date: Aug 27, 2026
Why it matters
This is an early official signal of a proposed physical change at a specific Sacramento location.

Open the primary official record

Then · now · next

Then
We first captured this official record on Aug 27, 2026.
Now
The latest source record we hold shows Proposed; the source did not provide a record date.
Next
The City map lists planned start Jan 1, 2028 and planned end Dec 31, 2028. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.

“Then” is when this watch first captured the record. “Now” uses the source date when one is available.

Recorded timeline

No additional milestones have been captured yet.