Sacramento project record
Marysville Vision Zero is in City planning or preliminary engineering
Sacramento Public Works lists Marysville Vision Zero in the “Preliminary Engineering” phase. Along Marysville Boulevard from Arcade Boulevard to the North Avenue, reduce the number travelled lanes from four to two, resurface and rehabilitate pavement, construct new traffic signals, modify existing traffic signals, construct pedestrian signal, ADA upgrades, and safety improvements. Schedule fields are plans and may change.
- Where
- City of Sacramento · Del Paso Heights
- Status
- Proposed
- Date shown
- Watch capture date: Aug 27, 2026
- Why it matters
- This is an early official signal of a proposed physical change at a specific Sacramento location.
Open the primary official record
Then · now · next
- Then
- We first captured this official record on Aug 27, 2026.
- Now
- The latest source record we hold shows Proposed; the source did not provide a record date.
- Next
- The City map lists planned start Jan 1, 2028 and planned end Dec 31, 2028. The next documented phase would be design advancement or construction; schedule fields are plans, not promises.
Recorded timeline
No additional milestones have been captured yet.