Neighborhood watch
South Oak Park
Official planning, permit, business, food, liquor-license, Public Works capital-project, and project-linked City Hall records for this Sacramento neighborhood.
- Permit issued for ADU at 4590 MARTIN LUTHER KING JR BLVDPermit Issued
City records show a permit was issued on 2026-07-20 for EXPEDITED - EPC - New 2-story Duplex w/ enrollment in SMUD SolarShares. Primary SFD: 1243-sqft 3-bed / 2-.5-bath dwelling w/ 242-sqft attached garage and 20-sqft porch.…. An issued permit does not establish that construction has started.
- Permit issued for #: 26-024063 3406 16th ave at 3406 16TH AVEPermit Issued
City records show a permit was issued on 2026-07-20 for HSG #26-024063: No Structural Plans Required. Kitchen (cabinets and counter tops)and Bathroom(shower and vanity) remodel like for like, 8 windows replaced like for like. New…. An issued permit does not establish that construction has started.
- Permit issued for ADU at 5251 MARTIN LUTHER KING JR BLVDPermit Issued
City records show a permit was issued on 2026-07-17 for Expedited - commercial meter setup - new two story custom residence of 1st floor 602 sq ft , garage 256 sq ft and porch 82 sq ft , 2nd floor 835 sq ft = total 1436 sq. ft. with…. An issued permit does not establish that construction has started.
- Permit issued for #: 26-007474 4861 martin luther king jr blvd #1 at 4861 MARTIN LUTHER KING JR BLVDPermit Issued
City records show a permit was issued on 2026-06-30 for #: 26-007474 FOR UNIT 1-Remodel kitchen and bathroom and whole house floors paint minor electrical and minor plumbing. Water conserving fixtures are required to be installed…. An issued permit does not establish that construction has started.
- #: 26-007474 4861 martin luther king jr blvd permit cancelled at 4861 MARTIN LUTHER KING JR BLVDCancelled
City records list the permit as cancelled on 2026-06-30. Its recorded scope was #: 26-007474 Remodel kitchen and bathroom and whole house floors paint minor electrical and minor plumbing. Water conserving fixtures are required to be installed throughout…; it should not be presented as active work.